• Login
  • Home
  • News
  • Sports
  • Reel
  • World

    Concern grows over conditions on USS Abraham Lincoln

    Members of Trump’s cabinet remained on decoy plane, after Trump’s quiet exit

    Russia releases former US Marine reported in poor health

    Trump signs order to limit childhood vaccines and split MMR shots

    Israel rejects Trump’s 15-point plan for Gaza, Netanyahu says

    Fast-moving Canada wildfire doubles in size forcing thousands to flee homes

    Spain to impose border controls against Italy as row over Ceuta migrant influx intensifies

    Houthi attacks reportedly kill at least 30 Yemeni government forces

    Gianni Infantino says sorry but remains as Fifa president after executive meeting

  • Worklife
  • Travel
  • Future
  • More
    • Culture
    • Music
No Result
View All Result

Welcome to World News & Todays Top News Stories

Friday, August 14, 2026
  • Home
  • News
  • Sports
  • Reel
  • World

    Concern grows over conditions on USS Abraham Lincoln

    Members of Trump’s cabinet remained on decoy plane, after Trump’s quiet exit

    Russia releases former US Marine reported in poor health

    Trump signs order to limit childhood vaccines and split MMR shots

    Israel rejects Trump’s 15-point plan for Gaza, Netanyahu says

    Fast-moving Canada wildfire doubles in size forcing thousands to flee homes

    Spain to impose border controls against Italy as row over Ceuta migrant influx intensifies

    Houthi attacks reportedly kill at least 30 Yemeni government forces

    Gianni Infantino says sorry but remains as Fifa president after executive meeting

  • Worklife
  • Travel
  • Future
  • More
    • Culture
    • Music
No Result
View All Result
No Result
View All Result
ADVERTISEMENT

Data centres could pay hundreds of millions in deposits for power demands

July 29, 2026
in Technology
2 min read
0


Ofgem has proposed new measures which could see developers of data centres made to pay hundreds of millions of pounds up front.

The British energy regulator said a refundable fee should be charged for projects that want to connect to the network, amid mounting demand for connections to the electricity grid.

It is proposing developers pay a deposit between £237,500 to £712,500 per megawatt – meaning data centres seeking 1 gigawatt (GW) of power would have to pay hundreds of millions up front, paid back if the project was completed.

The proposal follows growing opposition in parts of the country to plans for new data centres, which are needed to power the artificial intelligence boom.

Data centres are large buildings which house computer servers used to store and process data and run the digital services which power the internet.

Ofgem has started a consultation on its proposals, which will run until 16 September.

It said the amount of electricity capacity being requested by projects seeking to connect to the grid had risen from 41 GW to 125 GW in the past year, reflecting a sharp increase in demand.

This is significantly more than double 2025’s peak electricity demand in Britain of around 46 GW.

The regulator said the projects would have to hit key milestones to keep their place in the grid connection queue, which has seen a surge in demand.

An increasing number of centres have been built around the world in recent years to provide the computing power needed to train and run AI systems.

But they are controversial, especially for people who live near them.

Residents have raised concerns about noise, electricity demand and the large amounts of water sometimes used to cool the high-performance chips that generate vast amounts of heat.



Source link

Related posts

Flock boss admits surveillance firm took too long to act over police abuse

August 14, 2026

Bumble divides users by ditching its signature ‘women-first’ chat rule

August 13, 2026
Previous Post

In Pictures: Buildings damaged after powerful earthquake hits south-west Japan

Next Post

Meta shares fall as frustration grows over AI spending plans

Next Post

Meta shares fall as frustration grows over AI spending plans

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent News

  • Flock boss admits surveillance firm took too long to act over police abuse
  • UK weather: Final day of heatwave for many before weekend cooldown
  • Concern grows over conditions on USS Abraham Lincoln

Category

  • Business
  • Have your say
  • In Pictures
  • Politics
  • Reel
  • Sports
  • Technology
  • Top News
  • World
  • Home
  • News
  • Sports
  • Reel
  • World

    Concern grows over conditions on USS Abraham Lincoln

    Members of Trump’s cabinet remained on decoy plane, after Trump’s quiet exit

    Russia releases former US Marine reported in poor health

    Trump signs order to limit childhood vaccines and split MMR shots

    Israel rejects Trump’s 15-point plan for Gaza, Netanyahu says

    Fast-moving Canada wildfire doubles in size forcing thousands to flee homes

    Spain to impose border controls against Italy as row over Ceuta migrant influx intensifies

    Houthi attacks reportedly kill at least 30 Yemeni government forces

    Gianni Infantino says sorry but remains as Fifa president after executive meeting

  • Worklife
  • Travel
  • Future
  • More

© 2023 GODJ - NEWS CORP - news.godj.com.

  • Home
  • News
  • Sport
  • Reel
  • Travel
  • WorkLife
  • Future
  • World
  • Technology
  • Login

© 2023 GODJ - NEWS CORP - news.godj.com.

Welcome Back!

Login to your account below

Forgotten Password?

Create New Account!

Fill the forms bellow to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In